Civil Aviation Authorities around the world require that drones must always be flown within the pilot’s visual line of sight. Flying BVLOS operations where drones fly long distances can only be achieved with special approvals like Part 107 waivers issued under the Federal Aviation Administration (FAA).
A waiver is a special permission granted by aviation authorities that allow one to operate in the BVLOS conditions outlined in the application. However, these approvals are notoriously difficult to achieve as they require drone operators to show how the necessary risk mitigations address safety of other aircraft or the people and property below.
The key to every successful approval is detailed documentation of flight operations
This is not a required document, but should be used as guidance to assess the intrinsic risk of your operation, mitigation required, and the final expected risk after applying various layers of mitigation.
Reference JARUS guidance. Keep in mind — this process might not be accepted by your CAA and you might need to “translate” it to your CAA’s safety risk management process.
Create, maintain, and follow established UAS documentation:
Develop a CONOP. This document should follow a standardized format such as the one provided by Joint Authorities for Rulemaking of Unmanned Systems (Jarus). Link
A system should be put in place to manage hazards, risk, and track aircraft/pilot issues. There are a few providers that currently offer such systems. We can provide recommendations.
Selecting an aircraft is a multi-step process. Your CAA might have a list of approved aircraft (ex. Transport Canada) or might offer no guidance.
Iris Automation has a list of approved BVLOS resellers as well that integrate directly with Casia from the OEM. Try to keep in mind the Size, Weight, and Power (SWAP) of the aircraft, C2 radios, autopilot compatibility, and any standard that the aircraft may need to meet. The FAA has already initiated sUAS type certification for some platforms!
Unfortunately, technology and regulations are still in development, and unlocking the National Airspace System entirely is still not possible.
BVLOS flights in urban and complex airspace are still in testing through various federal and industry partnerships. Keep the state of the industry in mind when identifying a use case and assessing your site:
Even with perfect documentation, your operation still must address ways you plan to avoid hazards, maintain compliance with unwaived regulations, and generally operate safely.
These can be separated into tactical and strategic mitigations. One example, given below, highlights Casia:
Ensure compliance with FCC regulations and current CAA guidance. Be prepared to address your C2 infrastructure limitations, performance, and overall implementation for the operation. Show and explain how you maintain C2 link with the aircraft along your proposed route.
The operators will need to prove to the CAA that the processes and procedures built are abided by, even after documentation has been submitted. The level of training required may vary (there are currently no standards) but programs specific to BVLOS, UAS SMS, and more do exist and provide third party verification!
Package your submission to the CAA in the most efficient way possible: label and include all attachments, reference specific sections, annexes, and documents, and walk the reviewer through the safety case.